Load-Bearing Wall Removal.

Structural engineering for load-bearing wall removal in Oakville, Mississauga, Toronto and across Ontario: beam, post and footing design with stamped drawings for your building permit.

Engineered for ExcellenceScroll to explore ↓

01 / Overview

Load-Bearing Wall Removal

Structural engineering for load-bearing wall removal in Oakville, Mississauga, Toronto and across Ontario: beam, post and footing design with stamped drawings for your building permit.

Opening up a kitchen or creating an open-concept main floor often means removing a load-bearing wall. That wall carries the floors and roof above it, so the load needs a new path down to the foundation: a properly sized beam, posts and footings.

BESTRU Consulting Engineers designs that support and prepares the stamped structural drawings you need for a building permit, so your contractor can open up the space safely.

02

Is Your Wall Load-Bearing?

Common signs a wall is load-bearing:

  • It runs across the floor joists, not parallel to them
  • It sits directly above a beam or wall in the basement
  • Floor joists or roof framing rest on it
  • It’s an exterior wall (these are almost always load-bearing)

Only a review of the framing can confirm it, which is why we prefer to start with a site visit.

03

What We Provide

  • Site visit to review the wall and the framing above and below
  • Beam design in steel, LVL or engineered wood, flush or dropped
  • Post design, following each point load down to the foundation
  • Footing checks, and new footing design where needed
  • Temporary shoring guidance for your contractor
  • Stamped structural drawings for your building permit
  • Responses to the city’s plan review comments
  • Permit application submission, available for an additional fee
04

How It Works

01

Tell us about your wall

Send photos and a short description. Simple cases can sometimes be scoped from photos.

02

Site visit

We review the framing on site. The site visit fee is typically credited to your project when you proceed with us.

03

Design and drawings

We design the beam, posts and footings and issue stamped drawings, typically within 2 to 3 business days for a typical wall removal.

04

Permit and construction

Submit the drawings with your permit application, or have us submit it for you. We stay available to support your contractor during construction.

05

Do You Need a Permit?

Yes. In Ontario, removing or altering a load-bearing wall requires a building permit from your municipality. The application must include drawings showing the new beam, posts and footings.

06

Frequently Asked Questions

01

Can you work with my contractor?

Yes. We coordinate directly with your contractor or designer, and answer their questions during construction.

02

Do you do the construction?

No. We’re the engineers: we design the support and prepare the drawings, and your contractor does the work.

03

How long does it take?

For a typical wall removal, drawings are usually ready within 2 to 3 business days after the site visit.

04

How much does it cost?

It depends on the wall, the span and the loads above. Request a quote and we’ll give you a clear price.

Let’s build with confidence

Have a project in mind?

Tell us what you’re planning. We’ll help you understand the next steps and the engineering support your project may need.